Traceability & Documentation

Traceability & Documentation

What is identified on the part, which records exist against your order, and how you obtain them after delivery.

Traceability is the link between the part in your hand and the records that describe how it was made. This section sets out what is identified, which records exist against an order, how long they are kept, and how you obtain them after delivery.

Every project runs under NDA. Documentation scope is set by the drawing, the applicable standard and the duty the part has to perform, and is confirmed at order placement — so what we issue and what your receiving inspection expects are the same list.

Identification and Records — Two Halves of One Chain

Traceability and documentation are often spoken of as one subject. They are two:

  • Traceability is the identification chain — which part this is, which melt it came from, which lot it was processed in.
  • Documentation is the written record of that chain — what was measured, what was found, and against which identifier it is held.

Each depends on the other. Without identification, a record has nothing to belong to; without the record, the marking on the part is only a number. A traceability system that has one but not the other cannot answer a question when one is asked.

Three pages sit under this one, each covering one part of the chain:

What Is Identified, and at What Level

Traceability operates at four levels. Not every level applies to every part — which ones apply depends on the drawing, the process route and whether marking is permitted on the component.

Level Identified by Where it appears Links to
Part Part identification / manufacturer code applied to drawing and specification requirements On the part — cast-in raised characters or stamped mark — or on a tag or label where marking is not permitted Order, drawing revision, inspection report
Melt / heat Heat (cast) number In the inspection record; retained against part identification Melting record, material certificate where supplied
Batch Casting lot, heat-treatment load, machining lot In the process record; lot reference on the packing list Process parameters, heat-treatment record, NDT reports
Shipment Packing list and order reference Packing list, dispatch documents Inspection report issued per shipment

Where a part passes through more than one site — melting at one, heat treatment at another, machining at a third — the identity of each site is held against the operation it performed, so that a question about one step does not require reconstructing the whole route.

How Parts Are Identified

  • Cast-in or stamped marking — applied where the drawing permits and where a suitable area exists.
  • Location — low-stress areas, clear of sealing faces, mating surfaces and wear surfaces, so that identification does not affect function or service life.
  • Tag or label — used where marking is not permitted by the drawing, where the part is too small, or where marking would create a stress raiser.
  • Lot-level identification — where individual marking is not possible, identity is held at batch level and stated on the packing list.

If your drawing specifies a marking format, location or content, it is followed as specified. Where the drawing is silent, we apply a method consistent with the part geometry and the service duty, and state it in the order documentation.

Documentation Supplied With an Order

Document Held against Issued
Inspection report — dimensional and visual, to drawing and applicable standard Part identification and order reference Per shipment, as PDF; hard copy where required
Material certificate to EN 10204 3.1, or 3.2 where third-party witness is agreed Heat number Where specified at order placement; subject to mill availability
Melting and heat-treatment records Heat number and heat-treatment load Retained; extract supplied with the inspection record
NDT reports (PT / MT / UT / RT) Part or batch Where specified by drawing or standard. Where your drawing or specification names a particular qualification scheme — ISO 9712, SNT-TC-1A or a national equivalent — conformance to that scheme is confirmed before production rather than assumed
First article / initial sample report Part number and drawing revision Where specified at order placement
Packing list and part identification Order reference Per shipment

What is checked is defined by the drawing, the applicable standard and the service duty the part has to perform — not by a fixed in-house checklist. This is confirmed when the order is placed, and restated in the order acknowledgement.

Where Records Are Kept, and for How Long

Records are held by the manufacturing facility assigned to your programme and are retrievable against the identifier on your part.

How long they are kept is determined by the applicable standard, the sector or regulatory requirement, and the documented-information requirements of the certified quality management system. Where a customer requires a specific or extended period, that requirement is agreed in writing between the parties; in that case the period set out in the commercial cooperation agreement concluded between the parties governs.

Retention periods and how to request records after delivery →

When a Question Arises

Traceability is not used every day; it is used when something needs to be established. A question arriving with a part identification — from your incoming inspection, from a field failure, or from an audit — is answered in one direction:

  • From the part — the identification on the component, the tag, or the packing list.
  • To the record — the inspection report, and the heat or lot it is held against.
  • To the step — which operation was performed where, and under which process parameters.

Where an issue is confirmed, the affected population can be narrowed by heat, lot, site or supplier. That is the practical value of holding identity at more than one level: the response can be proportionate to what is actually affected, rather than applied to all supply that merely looks similar.

What Traceability Does Not Mean

  • Not every measured dimension is recorded. What is recorded follows the drawing, the applicable standard and the inspection plan agreed for the part.
  • Not a public database. Records are not published or searchable; they are released on request to the original buyer.
  • Not transferable. Inspection reports and process records are issued to the original buyer under NDA, and are not released to third parties.
  • Not a substitute for material certification. Traceability identifies the heat; the material certificate is a separate document, supplied where the order requires it and where it is available from the mill.
  • Not valid indefinitely after modification. Traceability applies to the part as supplied; it does not extend to parts altered or re-machined after delivery outside our control.

Request Documentation

Tell us what your receiving inspection or quality system requires. We will confirm in writing what is retained and what can be supplied with the order, before you commit.

Contact engineering →  ·  Request a quotation →

Related Pages

Quality & Compliance · Batch & Lot Traceability · Inspection Records Retention · Supplier & Factory Coding · ISO 9001 · Other Relevant Certifications · Inspection & Testing

Scroll to Top